This week has been
a whirlwind of activity with the beginning of the 62010
studio experience. This week Team Flex formed itself and
is currently comprised of the following members and corresponding
roles: Steve Ferguson, Project
Manager
Camille Baker, Evaluator
Yun-Shuang Chang, Multimedia Developer
Haley Grizzle, Content Manager
JP Murrell, Instructional Designer
Saif Altalib, Consultant
Willie Mazyck, Consultant
Melinda Pethel, Consultant
In forming our team we have begun designing
our team web site and worked on gather the necessary
contact information and establishing channels of communication
for the Team.
On Monday August 22, 2005 Steve Ferguson
and JP Murrell of the team met with Dr. Julie Moore
of Alpha Phi Omega Service Fraternity about a potential
project opportunity. During this meeting the following
areas were discussed:
Scope of the project
Current needs assessment
Available content
Direction of the organization with the proposed project
General direction of the project
Team Flex received an abundant amount
of information from Dr. Moore and in this weeks Thursday
meeting we are going to review the content and scope
as a team and come to a decision on whether this is
a viable project, and in what direction we want to take
this project and what our scope should be.
Tasks to complete by Thursday
Meeting:
Project Website
Team Member Profiles and contact information
Review of content received from Dr. Moore
TOP
|
|
|
| |
|
|
| |
|
|
| |
 |
|
| |
|
Team Flex is off to a great start.
After meeting on Thursday, the team has been working
hard to get individual tasks completed. Thursday, August
25, 2005 Team Flex conducted the first meeting and the
following tasks were completed:
Reviewed content of the project and
first client meeting
Scope of the Project
Scheduled team meeting for Mon. @ 3.45
Developed the scope statement
Identified constraints
Identified target learner
Gave responsibility of the 15/5s to Camille
Each member took different responsibilities
away from the meeting. Haley worked on document preparation,
the style sheet, the profile chart for the website,
and typed the minutes to our last meeting. Following
Thursdays meeting the team decided to look at scope
statement individually for review, additions, deletions,
and editing. The document started with Haley and was
to end on Steve by Monday’s meeting. The scope statement
was to center around the Level 0 training of alumni
volunteers for APO. Haley is also working on registering
the Horizon Wimba accounts so that the team will be
able to meet online. Bettina has been responsible for
creating our website and has completed the team profile
on the project management site. She is still working
on the time log for the site. JP our instructional designer
has been busy reviewing the content received from our
client, Dr. Julie Moore of Alpha Phi Omega. Camille,
the evaluator, has begun to look at various dates that
APO will be in conferences so that evaluation can be
conducted during the creation of the product. She also
completed the 15/5 for the week.
Plans for the Upcoming Week
1. Meeting with Dr. Moore at
3:00 on Monday for approval of the proposal.
2. Group Meeting beginning at 3:45 on Monday
3. Group Meeting on Thursday at 4:30
4. If every thing goes well in the meeting with the
client, our group will begin analyzing the group project.
5. Discuss the content and design of the modules that
will be created.
TOP
|
|
|
| |
|
|
| |
|
|
| |
 |
|
| |
|
Many things happened this week as
Team Flex moved into analysis planning. As planned,
Team Flex met twice within the week to finish up details
surrounding the timeline of the project and begin the
planning of the first phase. The following tasks were
completed this week by Team Flex:
Monday Team Flex worked out a rough
draft timeline for the entire project that corresponded
with the actual due dates for the class. Thursday, the
timeline was updated and revised.
Our website was updated in the week
to show “project news,” “project details,” and “client
information.” Our team also took pictures in Thursday’s
meeting to post on the website. A project update will
be posted each week on the website for members and consultants
to find the agenda and meeting schedules.
One of our major tasks involved generating
a list resources so that the client could review what
was needed. The team has let Julie Moore know that we
need these resources within the given time frame. Our
resource list was created in Thursday’s meeting, but
was a work in progress through the weekend.
Another major task for the week was
to finish the scope document. This document was completed
and will be signed off in the next week’s period.
As a team, we divided the analysis
report into various individual tasks and each of us
have worked on these parts throughout the week. A rough
draft of each part is expected on Thursday, September
8, 2005.
The consultants joined in on our meeting
on Thursday and were given an idea of where they would
be requested to help. Each consultant was also given
time to ask questions and express any concerns that
they may have.
Plans for the Upcoming Week
1. Meet on Thursday with rough drafts
of the analysis parts.
2. Group meeting on Thursday, September 8.
TOP
|
|
|
| |
|
|
| |
|
|
| |
 |
|
| |
|
This week Team Flex completed the scope document and
it will be formatted and placed on the web by Thursday.
After meeting, team flex reviewed each of the parts
of the analysis phase. As mentioned last week, the team
decided to break this phase into parts so that each
member would have a part to complete. The break down
is as follows: Needs Analysis, Content Analysis, Learner
Analysis, Resource/Cost, and Delivery Options. These
will be due to the project manager on Thursday for a
week of revisions and final sign offs. The team has
also notified Julie Moore about the various resources
that we will be needing as soon as possible.
As a team we decided to use the Seeles/Glasgow
Model for our instructional design.
Monday, Team Flex met to regroup and
make sure everyone was moving along on each of their
parts in the analysis phase.
Thanks to the help of a consultant
our time log is now active and members are recording
their times as they spend them each week.
Plans for the Upcoming Week
1. Meet on Thursday with final
drafts of the broken down analysis parts.
2. Revising the parts and preparing them for final sign
off.
3. Formative Evaluation Plan
4. Group meeting on Thursday, September 15.
TOP
|
|
|
| |
|
 |
| |
This past week Team Flex met to revise work that has been
done on the analysis report parts. Before deciding on
how editing would be done we had to get a few things covered.
Monday, September 12, 2005 Team Flex had an online meeting
over Horizon Wimba. We were all in agreement that this
meeting did not go well because of the broken communication.
Horizon also takes a lot of planning ahead of time to
keep the meeting running smoothly. Also, as a team we
were reminded that the time logs are working and each
member should remember to log time as they work on the
different parts. As far as
editing the documents, we have set up a peer review
so that at least one other team member will closely
review the work of another team member. Every rough
draft will go through the designated peer and then through
Haley for formatting check. Other team members are more
than welcome to add feedback. We just wanted to make
sure at least one other person has reviewed the work
of a peer. During the meeting we each reviewed our peer’s
part of the analysis. This week we are working to make
corrections to our parts and complete the analysis report
for Thursday. The document will go through Steve and
Julie Moore for sign off. We have also asked Dr. Noah
to review our work before submitting it has a final
draft.
Things To Do:
1. Prepare a 5 minute
Presentation for Class on Thursday.
2. Prepare the final Analysis Report for Thursday.
3. ID Model Description.
4. Design Brief
5. Formative Evaluation Plan
|
|
|
| |
|
 |
| |
This week team flex has been extremely
busy working on the next phase in the project. We are
hoping to pull a Design Brief rough draft together by
Thursday. Team Flex completed the Analysis Document
last Friday, and has begun the final step, receiving
feedback and sign offs. Each member of Team Flex received
the document through email and made track changes. The
documents were all sent back to the content manager
for review, before sending them on to Steve, Julie Moore,
and Dr. Noah. By Monday, we expect sign offs from Steve
and Julie Moore. Due to an extended studio meeting our
team meeting was cut short, but we were able to divvy
up tasks for the upcoming week.
In the meeting we were able to decide
on the various tasks that we would take on for the week.
Among the things that should be written up in rough
draft form by Thursday are: task analysis, learning
objectives, return on investment, formative evaluation
plan, and testing strategies. Each member of the team
has partnered up with a consultant or another team member
to get this rough draft written and ready for Thursday.
Things to Do:
• Analysis sign offs
• Rough Draft Design Brief
• Start of the Flow Chart and Story Board
TOP
|
|
| |
|
 |
| |
Team Flex finished up the Analysis
Document last week and this week we received feedback
from the client. Very little changes need to be made,
so we are working to have it 100% complete by Thursday.
As a team we decided that some changes needed to be
made to our goals so these changes will be made in the
analysis document and reviewed by Julie Moore.
Team Flex has really worked hard this
week to get the design document pulled together. We
had two meetings this week in order to pull content
out of our manual for the development phase. In the
meeting, we found that two of our goals ran together
so we will be reworking the performance objectives and
then gathering the content for development. The formative
evaluation plan was completed along with the ROI.
Team Flex has decided to go ahead with
the beginnings of the development stage because the
flash animation will take up the majority of our time.
Our first screen shot was finished and placed on our
website for review. We are working to get approval from
Julie Moore so that we can continue the development.
We did run across one problem as we
discussed the design phase of our project. After mapping
out all of the performance objectives we are estimating
that the time to take the tutorial will increase. Julie
Moore asked for a 20-30 minute tutorial for APO, but
with the content that she has given us we will not be
able to do it in less than 45-60 minutes. We will be
going to her about this within the week to discuss a
resolution to this problem. Until then, we will continue
working on gathering the content that we will need for
each performance objectives. Test Items have also been
considered and are being created this week.
For the Next Week:
• Talk with Julie Moore about
time constraints
• Continue working on Design document
• Make revisions to Analysis and receive a sign off
• Continue work on the template
TOP
|
|
| |
|
 |
| |
This week Team Flex held only one meeting on Thursday
night to discuss matters dealing with the design phase.
During the meeting we had to visitors, Candy and Kristen,
join us from 6190.
As far as changes for the project,
we have two major changes taking place. First, we are
changing the scope of the project by lengthening the
expected time to complete the tutorial. Our initial
judgment of the time frame was estimated too low. This
change will be discussed with Julie Moore on Monday.
Also, we realized that two of our goals are very much
alike so we have decided that it makes more since to
combine them into one goal. That will also help with
the organization of the tutorial.
After the meeting, we each took a goal
from the design phase and we are working on pulling
the content. Each team member will set up meetings with
Bettina to discuss possible test items so that the expectations
are feasible. As a team we will work on storyboards
in the next weekend as well as review the content for
the project. Our main goals for the week were to clean
up the task analysis, work on the performance objectives
for the combined goals, come up with practical test
items, and pull content from the book. As a team we
are still in the design phase, but the development phase
has begun.
As far as the development, we have
a screen shot that has already been reviewed by the
client and will be edited accordingly. The next meeting
we will focus on organizing the content and the delivery.
For Next week:
1. Confirm new scope with Julie
Moore.
2. Work on combining goals and forming new performance
objectives.
3. Continue working on the completion of design document.
TOP
|
|
| |
|
 |
| |
This week Team Flex met twice
( Thursday and Monday). As a team we are working on extracting
content or organizing it. This includes and outline of
the content as well as the story board. We have successfully
combined Goal 4 and Goal 5 because of overlapping content.
These two goals will need to be revised in the Analysis
document and sent to Julie Moore for approval. As a team,
we also had to change the task analysis to fit the new
goal. We worked on pulling content for goals 3 and 4.
The content was then discussed as far as how the team
will actually present it. We decided on the presentation
of goal 3, so the team will begin development on this
module. As soon as goal 4 content is extracted, the team
will discuss its delivery and place it into a story board
for development. Team Flex
will be working hard on goal 3 and 4 until we receive
notification from JP that we need to work on goals 1
and 2. We are not sure whether these two goals have
been completed yet. Regardless, goal 3 and 4 seem to
be the most extensive and time consuming.
To do:
Determine presentation
style and interaction for goal 4
Draw Story boards for goals 3 and 4
Update goal 4 in Analysis Report and get approved by
Julie Moore.
Create working prototypes of test items discussed
Begin development of Goal 3
TOP
|
|
| |
|
 |
| |
This past week was a very work intensive week for Team
Flex. Our Thursday meeting was very content specific as
we talked in depth about how we will present the content
for Goals 1,2 and 4. Content has been organized for all
of the goals and this week we concentrated on storyboards.
The story boards for goals 3 and 4 were combined after
our team discussed the similarity in the content. It was
brought to our attention that the two should probably
be combined so that when we present it, it is not placed
in separate formats to create confusion. This storyboard
and prototype are complete and ready for revisions. Within
the next week all of the storyboards should be complete
in their final draft and all of the modules will be ready
for development. The following
website will take you to the beginnings of our development.
This is a prototype of our goal 3 and 4 module.
http://www.arches.uga.edu/~bettinac/apo/
We would also like to thank the 6190
participants who came in and joined our meeting. We
had about 6 members come in and join us. Hopefully they
learned something from the meeting.


TO DO:
Work on final drafts of all storyboards
and test items.
Get prototypes ready for each module.
Compile the Design Document and have
the client review and sign off on it.
Continue development of the modules.
TOP
|
|
| |
|
 |
| |
Team Flex had a wonderful
fall break. We were not able to meet on Thursday, but
we did get back together on Monday. This week we got together
with Julie Moore so she could look over the prototype
we have for one of our modules. We have almost compiled
all of the Design Document. The only thing needed for
this document are the updated goals. As
for storyboards, we have completed storyboards for goals
1 and 2. We are still trying to get the storyboards
together for goals 1 , 2, and 5. Bettina has asked us
that we take the storyboards first to Julie Moore before
we begin development on those prototypes. The flash
required for the modules is difficult and time consuming
so we are trying to get it as close to perfect as we
can. Dr. Moore did give us some changes to be made on
the prototype for the module covering goal 3 and 4,
so we are trying to make these changes within the week.
Now is the time that we will ask the
consultants to get involved. We are starting to need
some work done that already has a skeleton created.
Unfortunately we have lost one of our consultants but
Saif and Willie are ready to work. Most of all, we are
just trying to get caught up to our deadlines, we seem
to have fallen back just a bit. This week will be a
week of catching up for Team Flex.
Things to be Done:
Update Test Item for goals 3
and 4.
Story boards for 1, 2, and 5
Storyboard approval from Dr. Moore
Development continues
Complete Design Document
TOP |
|
| |
|
 |
| |
Team Flex is falling behind just a little as we are still
trying to get things perfect with our module 3. After
talking to Julie Moore we got a lot of feedback about
the module and many changes have to take place. The overall
feel is that it looks good, but it is not being seen as
professional enough. We also have to change some of our
information to fit what Dr. Moore wants. In this week’s
meeting, we focused on gathering the tasks that need to
be finished to perfect module three while we are waiting
for response on goals 1 and 2 storyboards. The amount
to be finished is becoming a little overwhelming as we
think about our time creeping away. Overall,
Julie Moore wrote us a list of changes and suggestions
that she would like done on the module that we have
sent to her. As far as continuing development, we are
waiting for her feedback. The things left to finish
as far as Module 3 are listed:
- Correct Grammar and reword informative
paragraphs about each member
- add intros to each level
- change the second test item
- change the national level information to fit what
she wants
- change bullets to align
- link the glossary given to us by Julie Moore
These are the tasks that we have taken
away to complete by our next Thursday meeting.
Our design document was signed
off by Dr. Moore and can be found on our project management
site.
TOP
|
|
| |
|
 |
| |
Team Flex has continued on...the following items are updates
on our progress:
• Storyboards for Goals 1-4 are complete – everything
looks ok.
• Storyboards have been approved, but we are still waiting
on information to complete the storyboard for goal 5
The next major item on our to-do-list
in the development document. The following will be worked
on this week with hopes of completing a first draft
by Thursday.
• Media rationale – statement as to why we chose flash
• Storyboards – all except one finished
• Screen shots of prototype – four needed
• Site map/module mapping
• Sign off sheet – finished
Team Flex is also working hard on Evaluation.
The following are items that have been or need to be
completed:
• Formative Evaluation Plan first draft finished and
sent out for feedback.
• Need to compile feedback that we have received so
far.
Other Items on our list-to-do
for the week include:
• home page – introduction content, accessibility statement
• table of contents
• Help button – site map completed just needs to be
updated on module
• flow chart/site map
• Contact information – waiting on Julie Moore
• Send approved storyboards to Haley!
TOP
|
|
| |
|
 |
| |
Team Flex is working hard to finish up without getting
distracted by the holiday. We are still waiting on content
from Dr. Moore. She has told us that she will be getting
us the introductory paragraphs we need. As
for the modules, we are still needing to complete the
storyboard for Module 4. We need to update the contact
information, link and directions.
This week we plan on asking saif to
develop a form for the evaluation. This form will serve
to collect the answers of those taking the surveys and
sending it to the correct person for review. This person
will most likely be the person making changes to the
tutorial as needed.
Development Document Status
• We still need story boards
• Waiting on the official flow chart.
• Need screen shots as soon as the module is complete.
Evaluation
• Need to make changes to the evaluation form so that
it better suits our needs..
• Changes made to apo survey by hand and on document
to be sent out to make track changes
• Need to create summative evaluation per tasks
• Will work to begin the evaluation plan skeleton
TOP
|
|
| |
|
 |
| |
Team Flex is working on the final
evaluation stage as well as getting the modules into their
final form. Our team has worked to come up with our final
questionnaires for our formative and summative evaluations
although we have already done open ended formative evaluation.
As far as our client, we are
waiting for Dr. Moore to give us introductory paragraphs
for the modules. Once we have these our modules will
be ready for review.
This week we will be working on evaluating
the modules and looking to make sure the grammar/spelling
is correct, the links work and the check for tutorial
completeness.
As far as the development document,
we are still waiting on a few items before the document
is complete. As soon as we have compiled all of the
storyboards, received the final flow chart and screen
shots the development document should be ready for review.
We plan to have this finished by Thursday.
Our consultants have been working hard
for us in the end of the project. Saif is completing
forms for our evaluation and Willie helped create the
surveys we are using for evaluation.
To Do:
Gather screen shots
Compile storyboards for development document.
Finish development document for sign off.
Review each of the modules for grammar and spelling.
Check over evaluation plan.
TOP
|
|
| |
|
 |
| |
Team Flex is getting to a stressful
point as is every other team in 6210. We are in our
evaluation phase and relying on feedback. So far we
have gotten responses from three people, but we hope
for more. Although we are running out of time, we would
like to place the feedback we get and don’t have time
to change in the extension proposal.
The following things
are the things that Team flex needs to do:
-Email JM link to module for feedback
from her and APO alumni volunteers
- Ask about intro paragraphs to each organizational
level
-Review Formative Evaluation Plan
-Work on Final Evaluation Report
-Revise survey and have survey responses
sent to Camille for Eval. gathering
-Format final development document
-Format final evaluation plan document
-Activity Log
-Extension Proposal
Our client has signed off on reports
and we are now trying to complete the evaluation report
for the final compilation of documents.
We are aiming to have all of
these tasks 100% complete by Thursday morning. Wish
us luck!!!